Every addition and every dormer changes the structure of the house, so each one goes through a building department. The details differ from one town or village to the next, and they change over time.

This page is general information for homeowners, not legal advice. Check with your town or village before you plan, and read the official pages linked below.

  1. Who issues the permit

    On Long Island, building permits come from the town, the city, or the incorporated village that has the house. If you live in a hamlet, that is usually the town. If you live in an incorporated village, the village has its own building department.

    Nassau County towns
    Oyster Bay, Hempstead, and North Hempstead, plus the cities of Glen Cove and Long Beach and the incorporated villages, each with their own department.
    Suffolk County towns
    Huntington, Smithtown, Islip, Brookhaven, Babylon, and the East End towns, plus the incorporated villages.

    Smithtown, for example, says its building department does not take applications for projects in the Village of the Branch, Nissequogue, or Head of the Harbor, which have their own. In the Town of Huntington, the Building and Housing Division reviews building and site plans, issues building permits, inspects construction as it progresses, and issues certificates of occupancy. Hempstead and Smithtown take residential applications online; Oyster Bay's Building Division lists all additions to houses among the projects that generally require a permit.

    Sources: Town of Smithtown, Village Building Departments; Town of Huntington, Building and Housing; Town of Hempstead, Building Department; Town of Smithtown, Online Residential Building Permits; Town of Oyster Bay, Building Division.

  2. What is usually needed

    A survey
    A survey of the property showing the lot lines and where the house sits. Oyster Bay's Building Division says applications for new construction generally go in with a copy of the survey and two copies of the plans.
    Stamped plans
    Drawings prepared and stamped by a New York licensed professional engineer or registered architect when the Education Law requires it, per the state's checklist: a site plan, floor plans, elevations, sections, and foundation and framing plans.
    A zoning check
    The site plan shows the distances from the house to the lot lines. The town checks the design against its zoning code: setbacks, height, and how much of the lot is covered.
    Possibly a variance
    If the design does not meet the zoning code, the town's board of appeals can hear the case and grant relief, a variance, after a public hearing.

    The state's checklist also lists a structural design affidavit, where applicable, for additions over one story, which matters for a second story. Your building department has the final list for your house.

    Sources: Town of Oyster Bay, Building Division; New York State Department of State, Division of Building Standards and Codes, Building Permit Application Checklist; Town of Hempstead, Board of Appeals.

  3. The order of the steps

    1. Find your survey, or order a new oneEverything after is drawn on it.
    2. Check the zoningSetbacks, height, and lot coverage decide what can be built and where, before any design is final.
    3. Get the plans drawn and stampedBy a licensed engineer or architect where the law requires it, with the structure worked out.
    4. File with the building departmentThe application, the survey, the plans, and the fees, in the form your town or village asks for.
    5. Go to the board of appeals, if neededOnly if the design needs a variance. The board holds a public hearing and decides.
    6. Get the permit, then buildWork that needs a permit should not start until the permit is issued.
    7. Inspections as the work goes upInspectors check the work at stages. Getting them out on time takes planning.
    8. Final sign offThe town closes out the permit, with a certificate of occupancy or completion where one is required.
  4. Why not to skip the permit

    The New York Attorney General's office says that even though a qualified contractor should know the permits and inspections a job needs, you should know them as well, and to check with your local building department before beginning a project.

    A permit is how an addition gets a plan review and inspections while the walls are still open. Work built without one has had neither, and it can come back up later, for example when you go to sell the house. A contractor who suggests skipping a permit the job needs is a red flag.

    Sources: New York State Attorney General, Hiring a Home Improvement Contractor.

Questions

Permit questions

Do I need a permit for a home addition on Long Island?
Yes. An addition changes the structure of the house, so it goes through the building department of your town, city, or incorporated village. Check with them before you plan.
Do I need a permit for a dormer?
Yes. A dormer changes the structure of the house, so it goes through the building department. Expect a survey and plans, and a zoning check of height and setbacks.
Which building department do I file with?
The town if you live in a hamlet, or the village or city if you live in an incorporated village or a city. Smithtown, for example, does not take applications for the Village of the Branch, Nissequogue, or Head of the Harbor, which have their own departments.
Do I need an architect or an engineer for an addition?
Often, yes. New York's building permit checklist says drawings are prepared and stamped by a licensed professional engineer or registered architect when the Education Law requires it. Your building department will tell you what it needs for your house.
What is a variance?
Relief from a zoning rule, such as a setback or a height limit, granted by the town's board of appeals after a public hearing. It is needed only when a design does not meet the zoning code.
Who gets the permit, me or the contractor?
Ask before you sign: which permits the job needs, who will apply for them, and who will meet the inspector. P. Cullen and Son handles all permits and plans.

Talk to Pat

Tell us about your house.

The Quick Form takes a minute. Or call Pat directly. Either way, you talk to the family whose name is on the company.

Quick Form

Tell us about your home and what you want to do. Pat Cullen will get back to you.

What do you want to do to your home?

Choose all that apply.

When do you want to start?

Or call Pat at 631-368-1847

Have plans or a sketch? Email them to Pat after you send this form: Hamatime@optonline.net

We use your details only to answer your request. See our privacy policy.